References
Here you will find a continuously updated list of projects in the water/wastewater sector that we have carried out in recent years
Klingele Papierwerke GmbH & Co. KG
Period: 2020 - 2021
Services: Metrological system analysis of the vacuum system concept development Creation of a heat balance concept developmentDS Smith
Period: 2020
Services:Creation of detailed tender documents for the expansion of the biological wastewater treatment with an anaerobic system, the conversion of the activation and the installation of a secondary clarification system in a former activation tank
Carl Macher GmbH & Co.KG
Period: 2019 - 2021
Services:Concept study, basic and detail engineering of the wastewater treatment plant rebuild with the following sub-projects:
- Connection and commissioning of a lime sink
- New biogas treatment plant (flare, buffer, extension of biogas scrubber, dryer)
- New anaerobic reactors
- Conversion of the former anaerobic reactors to aeration tanks
- Conversion of a previously discontinuous activation to continuous operation
- Conversion of a previously discontinuous activation to a secondary clarifier
- New installation of sand filters
Hamburger
Period: 2019 - 2021
Services:Basic and detail engineering for a new microflotation and disc filter and the conversion of the primary clarifier to a secondary clarification system
DS Smith
Period: 2019
Services:Basic engineering for the expansion of the wastewater treatment with a pineapple plant, the conversion of the activation and the installation of a secondary clarification system in a former activation tank
Papierfabrik Palm
Period: 2018 - 2020
Services:- Basic-, detail engineering and support of approval planning for a new wastewater treatment plant and a new freshwater treatment plant
- Erection supervision and commissioning support
Papier- und Kartonfabrik Varel GmbH & Co. KG
Period: 2018 - 2019
Services:Approval planning according to §16 BImSchG for the rebuild of paper machine PM4
Union Industrial de Papel S.A.
Period: 2018
Services:- Feasibility study for new PM,
- gas turbine with waste heat boiler,
- reject combustion and waste water treatment
Mondi Ruzomberok
Period: 2017 - 2019
Services:- Basic and detail engineering,
- Tendering of a new anaerobic/aerobic wastewater treatment plant incl. sludge treatment and fresh water treatment for the new construction project PM19
Nine Dragons
Period: 2017
Services:Advice on denitrification of waste water
Papier- und Kartonfabrik Varel GmbH & Co. KG
Period: 2016 - 2019
Services:Basic and detailed engineering including construction planning for the expansion of the process water treatment plant.
- Extension of anaerobic and gas scrubbing plant,
- New construction of intercooling,
- Conversion of a UASB plant to an activated sludge plant,
- Conversion of an aeration basin to a secondary clarification stage
Leipa Georg Leinfelder GmbH
Period: 2016 - 2018
Services:Project expertise PM5 conversion from press paper to packaging paper
Mondi Syktyvkar
Period: 2016
Services:Basic engineering of the extension of the sludge presses including the new construction of
- sludge thickeners
- new construction of a nutrient storage and dosing system
- reconstruction of the intermediate clarifiers
- upgrade of the sludge recirculation system of the second biological stage
- extension of the grit chamber by a floating sludge discharge system
DS Smith
Period: 2015 - 2016
Services:- Basic and detail engineering for the extension of the activated sludge system
- New construction of a suction scraper secondary clarifier
- Extension of the biogas scrubber
- Assembly supervision
Hamburger
Period: 2014 - 2016
Services:Preparation of tender documents and detail engineering of the extension of the anaerobic wastewater treatment with biogas scrubbing and utilization in the plant's own natural gas boiler, detail engineering of other components of the wastewater treatment, risk assessment, installation supervision
Aviretta GmbH
Period: 2014 - 2015
Services:Basic and detail engineering, erection supervision and commissioning of the PM4 stock preparation rebuild from newsprint to corrugated base paper including new construction of an anaerobic wastewater pretreatment with biogas handling
Execution of the approval procedure according to § 16 BImSchG (Federal Immission Control Act) for the entire project including rebuild of the PM4 (offset dryer section, installation of film press)